DwellPilotSign inCheck an address

NE 102nd Ave, Portland, OR

Parkrose Heights, Portland · Zone R5 · 47,480 SF

Preliminary report · Sample from a real run, house number removed · See the Lents sample

Your goal

Site map

250
260
270
280
280
Leaflet Aerial photo © City of Portland

Setback check: Front 10 ft · Side 5 ft · Rear 5 ft. Measured from the mapped parcel boundary.

The Parkrose Heights sample lot. Click an outbuilding to see the lot without it. Dimensions are approximate and come from county tax lots.
Explore site records and building scenarios

If outbuildings come down

Click a building on the map, or a button above, to see it removed. The build area outline and these numbers update.

Street frontage and right-of-way

NE 102nd Ave

District Collector · Major Transit Priority Street · Major City Walkway · City Bikeway · Major Emergency Response · Civic Corridor

Frontage
103 ft
Right-of-way
about 84 ftstandard 60 ft
Paved
about 66 ftcurb
Possible dedication
Not expectedfor this type of project

NE Thompson St · unimproved

Local street on every class

Frontage
63 ft
Right-of-way
about 39 ftstandard 60 ft
Paved
about 28 ftno curb
Possible dedication
Not expectedfor this type of project

Whether the city asks for a dedication depends on what you build:

Not usually requiredExempt under the middle housing conversion rule when the house stays, the site ends up with 3 units or fewer and each new unit is 1,199 SF or less. Larger new units lose the exemption.

Dedication moves the front lot line back; setbacks are then measured from the new line. Dedication goes up to and around existing buildings. The city decides at permit or land-use review. PBOT TRN-1.30 frontage improvement and dedication thresholds

Right-of-way widths are measured lot line to lot line from county tax lots; paved widths come from city pavement records. A survey confirms both.

Utilities at the lot

Sewer main
15 in.
Your lateral
6 in.about 10 ft deep
Water main
24 in.
Water service
3/4 in.copper

A 12 in. storm main runs in the street. Stormwater still goes to on-site systems first where soils allow.

New water services and meters in Portland are at least 1 in. Adding units on the existing meter means a meter sizing review, so plan on an upsize or a separate meter.

From city sewer and water records. Sizes and depths are as mapped; the team confirms connections with the utilities.

Zoning and plans

Zone
R5
Comp Plan
–
Abuts
Same zone
Frequent transit
277 ft6 stops within ¼ mi

No planned street connections near the lot. No paving moratorium on the frontage.

Fire reach and setbacks

Within 150 ft
72%of the lot
Farthest point
382 ftstraight line
Front setback
10 ft
Side / rear
5 / 5 ft

Measured from NE 102nd Ave, plus NE Thompson St, which the fire marshal already treats as a fire route. Portland: within 150 ft no sprinklers needed; 150–250 ft with sprinklers; beyond 250 ft only by fire code appeal.

Straight-line distance from the lot line along each improved street. Fire measures the hose path around buildings, so the real reach is shorter.

Streets and traffic

NE 102nd Ave
30 mphposted speed
NE Thompson St
20 mphposted speed
Daily traffic
158NE Thompson St E of 102nd Ave, 2018
Daily traffic
9,420NE 102nd Ave S of Sacramento St, 2019

NE 102nd Ave is on the high-crash network for walking. Driveway location and sight distance get a closer look there.

Sidewalk is mapped along the frontage.

NE Thompson St is mapped as unimproved right-of-way.

Planned projects nearby

  • NE 102nd Ave Corridor ImprovementsTSP · 1-10 years · $5.2M · on the frontage
  • Gateway Local Street Improvements, Phase 1TSP · 1-10 years · $8.4M · 100 ft
  • Gateway Regional Center TSMTSP · 11-20 years · $1.9M · 100 ft
  • Gateway Local Street Improvements, Phase 2TSP · 11-20 years · $8.4M · 100 ft
  • Halsey/Weidler Safety and Access to TransitTSP · 1-10 years · $5.0M · 243 ft
  • NE THOMPSON ST. 130' wo NE 105th AveStreet permit TF0189 · design · 676 ft

From adopted transportation plans and PBOT street permits. Projects on the frontage can set future curb lines, driveways and dedication.

Neighborhood

Walkability
47of 100
Regional Center
317 ftGateway Regional Center
Historic
None near
Archaeology
Not mapped
Displacement risk
85higher-risk tract

About 48% of renters in the tract are cost-burdened.

Lot split test fit

Up to 9 lotsPortland 33.610 lot dimensions: 3,000 to 8,500 SF lots, 36 ft wide, 30 ft of frontage.

  • Lot 1 8,077 SF · 86 × 94 ft · 86 ft frontage · keeps the house
  • Lot 2 4,717 SF · 50 × 95 ft · 50 ft frontage
  • Lot 3 4,737 SF · 50 × 95 ft · 50 ft frontage
  • Lot 4 4,756 SF · 50 × 95 ft · 50 ft frontage
  • Lot 5 3,868 SF · 50 × 78 ft · 50 ft frontage
  • Lot 6 4,776 SF · 50 × 96 ft · 50 ft frontage
  • Lot 7 3,052 SF · 50 × 77 ft · 50 ft frontage
  • Lot 8 4,796 SF · 50 × 96 ft · 50 ft frontage
  • Lot 9 4,599 SF · 50 × 97 ft · 50 ft frontage

Cut lines cross 2 existing buildings; the lane runs about 386 ft.

A geometric test fit only: straight cut lines, no survey, no street dedication taken out. Density, tree and utility rules still apply, and three or fewer lots is a partition; four or more is a subdivision. A private lane over 150 ft long needs a fire turnaround, so lane layouts go to the team for fire review.

Building envelope

Height limit
30 ftPortland 33.110.215
Likely build area
28,118 SF
Stories that fit
2
Floor area cap
23,922 to 38,274 SF1 unit to 4+ units

Houses, duplexes, triplexes, fourplexes and cottage clusters share the base zone height in Portland single-dwelling zones.

Trees and tree rules

From the tree surveyTrees come from the owner's tree survey (November 2026). 31 lidar tree tops the survey does not show were treated as removed since the lidar flight, and their canopy was cleared from the map.

On-site trees
1110 regulated
Large trees
6216 in. of trunk, 4 medium
Lidar read
4431 since removed
Neighboring trees
5Their root zones can still limit work
Heritage trees nearby
1
Tree fee, worst case
$103,8409 in the likely build area

Nuisance-list species (such as English holly and Portuguese or English laurel) and dead trees are exempt from Title 11 preservation; the city confirms exemptions at permit.

Portland Title 11: on a development site, keep at least one-third of private trees 12 in. and larger and every tree 20 in. and larger, or pay into the Tree Fund.

$1,888 per 12–20 in. tree below the one-third retention; $472 per diameter inch for 20 in. and larger. Portland Title 11 tree fee schedule (effective July 10, 2026).

Sewer by gravity

88%7%5%

Drains at 2%Only at 1%Pump likely

265271277At the main221 ft run

Main about 10 ft deep, from city records. The pipe line rises 2% from the main with 1.5 ft of cover; where it climbs above the ground line, that part of the lot needs a pump or a deeper main.

Basement on record (500 SF). The house has a 500 SF basement on record. Basement plumbing usually means the house sewer leaves the foundation 7 to 9 ft below the main floor, which points to a deep lateral and main. That generally helps new units drain by gravity, but it also means deeper, costlier trenching at the connection.

Cesspool or septic

LikelyOld cesspool likely

  • Built in 1936, in the Mid-County area that had no public sewer until the Mid-County Sewer Project (1986–2001). Homes here used cesspools, and many were left in place when the house was connected.
  • The house connects to the public sewer through its own lateral (about 10 ft deep at the main), so any old pit is abandoned, not in use.

Setbacks and decommissioning. Oregon: an abandoned cesspool or septic tank within 10 ft of new construction must be decommissioned under permit (pumped by a licensed pumper and filled, or removed), and fill within 10 ft may need to be structural with compaction testing. An active system keeps foundations 10 ft from the drainfield and 5 ft from the tank (OAR 340-071-0220).

Next: Ask the owner what they know, check the original permit or sewer connection card, and probe 10 to 12 ft out from the foundation near the vent stack before siting a foundation there.

Portland septic decommissioning permits · OAR 340-071-0220, Table 1 setbacks · OAR 340-071-0185, decommissioning

Earthquake, slope and soil

Liquefaction
None mappedSettlement 0 ft
Lateral spread
Less than 6 in.
Deep landslide
Low
Stormwater on site
FairSoil group B, well drained

Soils should take stormwater on site (drywell or infiltration planter), pending an infiltration test.

From City of Portland and DOGAMI hazard maps.

Noise and water

High noiseAbout 66 dBA from I-84, 232 ft away.

Water pressure
63–69 psiKelly Butte 427 Tank
Main in the street
24 in.
Fire flow, first read
~3,500 gpmrough estimate from the 24 in. main
Fire flow needed
1,000 gpmFire code Appendix B, one- and two-family buildings up to 3,600 SF

Road noise is a rough estimate from distance to the nearest freeway or highway (about 76 dBA at 50 ft from a freeway, falling about 4.5 dB each time the distance doubles). Buildings and walls in between cut it further.

Static pressure is the zone hydraulic grade minus the ground at the build area (0.433 psi per foot). Available fire flow comes from a hydrant flow test; the main size gives only a first read.

Title and lot history

Plat
Not in a plat
Recorded easements
1
CC&R risk
Unlikely
  • Sewer Easement to City of Portland

Mapped easements and plats only. CC&Rs, private easements and access agreements are on the title report, which the team reads before design.

8 permits on this lot · 1 expired · 5 tree permits

  • Feb 2025 Parks Urban Forestry · Removal/Replant Final
  • Feb 2025 Parks Urban Forestry · Removal/Replant Denied
  • Feb 2024 Parks Urban Forestry · Removal/Replant Final
  • Mar 2022 Parks Urban Forestry · Removal/Replant Expired
  • Mar 2022 Parks Urban Forestry · Removal/Replant Denied
  • Mar 2021 Electrical Permit · Residential 1 & 2 Family Final

Recent new-home sales and rents

Sales found
3Built since 2012, last 4 years
Median per SF
$257
Median price
$500,000
  • $799,900 3,116 SF, built 2023 Jan 2026 · 0.4 mi
  • $500,000 2,061 SF, built 2016 Nov 2024 · 0.4 mi
  • $439,000 1,546 SF, built 2016 Jan 2023 · 0.5 mi
Studio ADU, about 450 SF
$1,649/mo
1-bed ADU, about 650 SF
$1,764/mo
2-bed cottage, about 900 SF
$2,028/mo
3-bed home, about 1,250 SF
$2,754/mo

Homes built since 2012 that sold in the last four years within half a mile. County sale records can bundle several lots in one price, so outliers are dropped. Rents are a planning seed, not a market survey. Rents: HUD FY2027 Fair Market Rent, Portland-Vancouver-Hillsboro MSA (effective Oct 1, 2026), plus 8% for new construction (seed).

3D site plan

The lot on its real ground as it stands today, with the buildings and trees. Turn on the recommended development path, or open the advanced view to edit the layout.

See the before-and-after comparison

What can I build?

Basement ADU conversion

Confirm 9 paths screened

What will it cost?

$109k–$129k

About $1,707/mo rent

What could stop it?

3 required, 3 to confirm

Heritage tree: European beech (88 in.)

Basement ADU conversion

Confirm

Strongest rental return of the paths that screen in: about $1,707/mo rent on $120k all-in (11.6% yield on cost).

All-in range
$109k–$129k
Monthly rent
$1,707
Value-created return
93.2%
New units
2 on the lot

Why it screens in

  • No ADU on record: No existing ADU found.
  • 500 SF basement; exempt from the 800 SF cap (house 5+ years old).
  • Lowest cost per unit when the shell is sound.
  • Fire separation, egress and ceiling height drive cost.

How long it takes

  1. Design4–8 weeks
  2. Permit1–3 months
  3. Build3–5 months

What moves the cost

  • Condition of the existing shell
  • Ceiling height, egress and moisture work
  • Finish level

ADU system development charges can be waived with a 10-year no-short-term-rental covenant.

Every path, ranked

Ranked by return at planning-level costs. Open a path to see why it lands where it does.

  1. 1Basement ADU conversionConfirm$109k–$129k$1,707/mo
    • No ADU on record: No existing ADU found.
    • 500 SF basement; exempt from the 800 SF cap (house 5+ years old).
    • Lowest cost per unit when the shell is sound.
    • Fire separation, egress and ceiling height drive cost.
  2. 2House + two ADUs (basement + detached)Fits$336k–$397k$3,670/mo
    • Existing house: 1,704 SF house on record.
    • Lot ≥ 3,000 SF (R5): Lot is 47,480 SF.
    • Only one ADU may be attached to the house.
    • Not compatible with a Middle Housing Land Division.
  3. 3Detached ADU (backyard cottage)Fits$252k–$298k$1,963/mo
    • Existing house: County shows a 1,704 SF house.
    • No existing ADU found in county records.
    • About 800 SF (800 SF cap governs); fits as a single story.
    • Height 20 ft (15 ft inside setbacks). No parking required.
  4. 4Fourplex retaining the house (rent)Fits$1.16M–$1.47M$7,998/mo
    • 1,704 SF house stays; qualifies for the retained-house FAR bonus (5+ years old; ≤25% of street façade altered assumed).
    • Lot ≥ 3,000 SF for 3–4 units: Lot is 47,480 SF.
    • NE THOMPSON ST is unimproved: PBOT charges the LTIC (~$39,800) in lieu of building curb and sidewalk; dedication may still apply.
    • The ~150 ft private fire lane (~5,400 SF of paving, ~$118,800) sits inside the access and utility allowance.
  5. 5Detached duplex: keep the house, add one unit (rent)Fits$398k–$506k$2,666/mo
    • 1,704 SF house stays; qualifies for the retained-house FAR bonus (5+ years old; ≤25% of street façade altered assumed).
    • FAR 0.7 × 47,480 SF = 33,236 SF total, less the house's 1,704 SF above grade = 31,532 SF (31,532 SF each). Coverage: max 6,561 SF (Table 110-5), existing 3,882 SF, 2,679 SF left → two-story units up to 5,358 SF each. Result: 1,400 SF each.
    • NE THOMPSON ST is unimproved: PBOT charges the LTIC (~$39,800) in lieu of building curb and sidewalk; dedication may still apply.
    • City permit fees and excise taxes itemize to ~$12,118; these sit inside the all-in cost.
  6. 6Separate the house, then a 14-cottage cluster on the remainderConfirm$1.68M–$3.5M$14k profit
    • Replat, partition or property line adjustment around the house (a PLA only works when the moved line stays within 120% of its current length; otherwise a replat). House lot ≈ 4,200 SF (smallest compliant carve 4,190 SF; zone maximum 8,500 SF).
    • House lot within the 8,500 SF maximum: 4,200 SF.
    • Two steps: replat or property line adjustment first, then cottage cluster + MHLD on the remainder.
    • Any building that would straddle the new house-lot line must be removed before the city approves it (or the line is drawn around it with setbacks).
  7. 7Affordable bonus: 6 units (half at 60% MFI)Fits$1.35M–$1.71M$9,122/mo
    • Lot ≥ 3,000 SF: Lot is 47,480 SF.
    • No z overlay: No z overlay.
    • FAR 1.2; 99-year affordability covenant with PHB; usually paired with nonprofit or regulated financing.
    • Not eligible for MHLD (5–6 units).
  8. 8Subdivision: 8 lots, keep the house and build 7 new homesConfirm$4.29M–$5.42M$-651k profit
    • 47,480 SF × 0.85 ÷ 5,000 = max 8; 47,480 SF × 0.68 ÷ 5,000 = min 6.
    • 47,480 SF − ~1,208 SF dedication − ~7,772 SF private street and turnaround ≈ 38,500 SF ÷ 8 ≈ 4,813 SF per lot; a house lot over 8,500 SF needs an Adjustment to maximum lot area.
    • Lot count follows the 33.610.100 density formulas; street dedication, whether a street is created and the surveyed site area move it.
    • Site area (47,480 SF on record) is within ~314 SF of a rounding threshold where the minimum rises to 7; the survey area sets the count.
  9. –Addition / expand the houseFits$156k–$185kNot ranked
    • Building coverage on record: 3,882 of 6,561 SF allowed.
    • Setbacks, height and floor-area limits govern where an addition can go.

For the basement ADU conversion, about 500 SF.

Lean

$92k

Typical

$118k

Upgraded

$129k

Per square foot
About $237/SF
Includes
Design, permits, utility connections, construction and a contingency
Leaves out
Financing, land and any system development charges that apply
Rent basis
HUD fair-market rent for the metro, adjusted for new construction

These are planning ranges from recent local work, not bids. They are meant for deciding whether a lot is worth a closer look.

Each check the engine ran, what it found and the code section behind it. Zoning and lot standards are below; the full report itemizes the rest.

128 checks against Portland Zoning Code (Title 33), Titles 11, 17 and 24, PBOT and Portland Fire & Rescue guidance.

  • 66 meets
  • 3 doesn't meet
  • 17 flag
  • 20 confirm

Zoning and overlays 2

Lot and site standards 10

  • Development paths54 checks
  • Thresholds that change the rules5 checks
  • Streets, access and utilities10 checks
  • Site constraints6 checks
  • Existing buildings4 checks
  • Neighborhood, streets and plans21 checks
  • Lot split, trees, hazards and title16 checks

Each line is a check the engine ran on public records, with the code it rests on. Section numbers point to the governing chapter; the city has the final word at permit or land-use review.

Every finding is marked. Required means the code or the city will ask for it. Confirm means the records suggest it and someone should verify. Note is worth knowing.

Required3 items

  • Heritage tree: European beech (88 in.)A city Heritage Tree stands ~32 ft from the lot (right of way, unimproved); its root protection zone is ~88 ft in radius and covers the NE Thompson St frontage.
  • More than one dwelling structure mappedCity building footprints show more than one residential structure on this parcel.
  • Trees in the likely build areaMapped canopy covers about 20,779 SF (74%) of the likely build area, plus ~8,810 SF within 10 ft of it. Private trees 12"+ diameter trigger tree preservation or mitigation (Title 11).

Confirm3 items

  • Fire access: approach confirmed with FireFire access approach confirmed with Portland Fire & Rescue (2025): NE Thompson St counts as an existing fire route, with a private apparatus road of ~150 ft (no turnaround needed).
  • Unimproved street frontage: NE Thompson StThe lot fronts NE Thompson St (63 ft), which has no curb and is not city-maintained.
  • Tree preservation shapes the layoutAbout 63% of the lot is under canopy, and land divisions and cottage clusters follow different tree rules.

Note1 item

  • Small steep patchCity maps show about 199 SF of the lot (0.4%) at 25%+ slope; the lot averages about 5% slope.

Aerial photograph of the neighbourhood around the lot, with I-205 to the west and NE 102nd Ave running north to south
The neighbourhood around the lot, with I-205 to the west and NE 102nd Ave through the middle. Imagery © Esri.
Area
Parkrose Heights, Portland
Zone
R5
Overlays
None
Lot size
47,480 SF
Dimensions
About 193 × 387 ft
House on record
1,704 SF, built 1936
Basement
500 SF
Market value
$549,070 (land $208,000)
Slope
About 5% average; 199 SF at 25%+
Soils
Group B, well drained
Sewer
Gravity to the public main (BES)
Water
Portland Water Bureau
Hydrants
8 nearby; farthest build point 268 ft
Frontage
NE 102nd Ave (curb, city-maintained); NE Thompson St (unimproved, 63 ft)
Tree canopy
63% of the lot; 74% of the likely build area
Notable trees
Heritage European beech, 88 in., in the right of way

Sources: county assessor, city and county GIS, Metro and DOGAMI lidar, USDA soils, the local water and sewer providers, and the city's current fee schedules.

Compare development paths, financing and nearby sales. See which site conditions to check first.

Aerial photograph of the NE 102nd Avenue sample in Parkrose Heights

  1. 1

    Check the Confirm items

    • Fire access: approach confirmed with Fire
    • Unimproved street frontage: NE Thompson St
    • Tree preservation shapes the layout

    A site visit or a call to the city settles most of these.

  2. 2

    Plan for the Required items

    • Heritage tree: European beech (88 in.)
    • More than one dwelling structure mapped
    • Trees in the likely build area

    These become studies, plans or conditions in the permit set.

  3. 3

    Talk it through with the team

    Bring the report to a short call and leave with a plan for the path you pick.

Run your own address

The real report reads your lot live from the city and county records.

Check a property